Bottom Rail Replacement
A new Accoya bottom rail made with slot tenons at both ends.This was for a listed property in Maidenhead that also needed new sash cords and draught excluder.
(Berks and Bucks)
A new Accoya bottom rail made with slot tenons at both ends.This was for a listed property in Maidenhead that also needed new sash cords and draught excluder.
The old gate cladding had completely rotted but the frame inside which was mainly metal with timber studs remained in good shape.The new cladding was in cedar and the shaped top in Accoya.The Accoya cap was made out of 5 … Read More
This rotten sash was delivered by the customer in the morning and was collected fully repaired in Accoya 5 hours later thanks to new technology 5 minute set wood glue.
This Roman arched door head in Maidenhead has been copied to match the original door frame including the glazing bar arrangement .The rise is exactly half the span making it a perfect Roman arch.
A new leaded roof at Steves in Bourne End, originally was cast iron and narrower but now has been widened with an each pair of sashes and a door added,so the right hand side window and door are 12 years … Read More
This Edwardian bay window replacement was a bit different to normal and needed 3 sliding sash windows to be bolted together on site at 30 degrees to make the perfect fit. Originally on weights the new bay needed to be … Read More
32 housing joints needed to be made every 11.25 degrees ,it took longer to make the jigs than it did to make .
Danny Wallet from Portsmouth holds up a letter of appreciation to Joinery Shop for all their hard work and commitment into delivering and installing Dan’s windows.”The last joiners we used let us down again and again with excuses like the … Read More
10 x bespoke made internal doors ,the stiles, head and bottoms rails are all proportionate as are the decorative mouldings around the panels .These doors are now ready to be hung for a property in Henley , Berks..