Sash window repairs in Windsor

This grade 2 listed building near the castle is around 250 years old.The top sash meeting rail has dropped at both ends because both tenons have completely rotted .The solution was to take out the sash and bring it to the workshop in order to remake and rejoint a new meeting rail this time in accoya .The reglazing was in linseed oil putty with a polymer bed.

BEFORE

AFTER

Leave a Reply

Your email address will not be published. Required fields are marked *