2 x mock gothic arched dormer windows on a listed building in Maidenhead (mid Victorian). The sill needed fully replacing along with both lower jambs and just to make things worse both casement sashes were badly rotten too.Total time approx. 4 days per window was required to do the repairs fully using Accoya.
Leave a Reply