These impressive new sliding sash windows have just returned from the high pressure preservation unit and are drying out before being fully painted with 4 coats of 10 year life paint ready for the double glazed units to be fitted and for installation to begin at Glade Road ,Marlow ,Bucks.The hollow jambs that accommodate the weights are simply constructed by gluing planking together using tongue and groove joints,new heavier weights are required as a result of the new windows having twice as much glass as before ,although in some cases some of the larger old weights can be recycled and used on the smaller new double glazed windows.
Leave a Reply